中文

How should tolerances be marked before RFQ?

目录
How should tolerances be marked before RFQ?
Procurement Tips
How Neway Can Help

How should tolerances be marked before RFQ?

Use standard GD&T symbols on the 2D drawing with feature control frames for geometric tolerances and direct dimension limits for size tolerances. Include a general tolerance note for unspecified dimensions.

GD&T tolerance marking on CNC drawing

CNC part tolerance specification example

Specification Note: Specify the standard used (ISO, ASME, DIN) in the drawing title block.

Procurement Tips

  • Use standard GD&T symbols

  • Specify tolerance standard in title block

  • Call out only critical functional tolerances

  • Use general tolerances for non-critical features

How Neway Can Help

Neway engineers review tolerance callouts and recommend adjustments.

Related Blogs
无数据
订阅以获取设计和制造专业提示,直接发送到您的收件箱。
分享此文章:
Copyright © 2026 Machining Precision Works Ltd.All Rights Reserved.