العربية

How should tolerances be marked before RFQ?

جدول المحتويات
How should tolerances be marked before RFQ?
Procurement Tips
How Neway Can Help

How should tolerances be marked before RFQ?

Use standard GD&T symbols on the 2D drawing with feature control frames for geometric tolerances and direct dimension limits for size tolerances. Include a general tolerance note for unspecified dimensions.

GD&T tolerance marking on CNC drawing

CNC part tolerance specification example

Specification Note: Specify the standard used (ISO, ASME, DIN) in the drawing title block.

Procurement Tips

  • Use standard GD&T symbols

  • Specify tolerance standard in title block

  • Call out only critical functional tolerances

  • Use general tolerances for non-critical features

How Neway Can Help

Neway engineers review tolerance callouts and recommend adjustments.

Related Blogs
لا توجد بيانات
اشترك للحصول على نصائح تصميم وتصنيع احترافية تصل إلى بريدك الوارد.
مشاركة هذا المنشور: